Precautions for production of ventilation pipe equipment of Fengxin Technology

2020-05-11 08:42:59
second

Jinan ventilation equipment does not work independently, it exists and operates as a whole production line system. The whole process from coil cutting to air duct forming is completed by machine processing equipment. No part of Chengdu is lack of ventilation duct equipment. When using the cutting equipment on the construction site, you can choose the second line and the third line of economical numerical control air duct production to level, press, cut and cut the plates. After that, the opened material is processed by multi-functional seaming machine, common plate flange machine, flanging machine and seaming machine. After the completion of the installation angle lifting can be. In the process of operation, all operations shall be completed according to the instructions, and the following matters shall be noted.

济南通风设备

1. Before work, it is necessary to check whether the data and system of all parts of the equipment are intact, and open the air compressor for trial operation. Overload operation is strictly prohibited.

2. The operation of ventilation equipment in Shandong must be completed by professional technicians. More than two people need to cooperate with each other. Other irrelevant personnel are strictly prohibited to approach when working on the ventilation pipeline equipment.


山东通风设备

 

3. Material selection of equipment parts. In the process of design, manufacture and maintenance, the spare parts produced by the original factory should be selected correctly according to the nature and characteristics of the parts. Wearing, corrosion, excessive deformation, fatigue, cracking and aging products are strictly prohibited for the parts of ventilation pipeline equipment.

4. Assembly quality problems. A reasonable initial clearance is required in this condition. If the initial clearance is too large, the effective life period will be shortened; in addition, the mutual position accuracy between the components in the assembly is also very important, if it fails to meet the requirements, it will cause additional stress, eccentric wear and other consequences.


通风设备厂家

5. Properly carry out maintenance. According to the principle of reasonable technology, economy and production efficiency, carry out reasonable maintenance. To ensure the quality of maintenance, installation and maintenance, it is necessary to ask professional personnel, or ask professional personnel for remote guidance. It is necessary to select and use the repair technology reasonably, pay attention to the preparation before the repair, carry out the operation according to the procedures during the repair process, and deal with the work after the repair.

Label

Recent:

1164.png

扬克气罩Mobile: + 86-15965759999
密闭气罩Tel.: + 86-0635-2531988
丰信科技Email: fengxin@cnfengxin.cn
密闭气罩Address: Hi tech Industrial Park, Linqing City, Shandong Province (shilitun, Xinhua office)

丰信科技


Scan